Rotating reliability maintenance asset engineer

Ces*** ***** (XX años)
Operations Maintenance & Reliability Integrity Coordinator Operation Assurance en Initec
niversidad Católica Santa Teresa de Jesús de Ávila, Ávila, Spain,
Las Rozas de Madrid,
Madrid
|
Experiencia
Operations Maintenance & Reliability Integrity Coordinator Operation Assurance
Initec
mar 2019 - jul 2020
Main Responsibilities:
 Supervised execution, compliance, and results of the management of Reliability and Maintenance requirements developed by the contractor such as Reliability Availability and Maintainability (RAM) analysis, FMEA, RCM, RBI analysis, operations/maintenance data management; Computerized Maintenance and Materials Management System (CMMMS) development; maintenance routines development; maintenance procedures development, criticality analysis, categorization of maintenance activities, spare parts and standardization.
 Worked, led closely with the Company and contractor in charge develop the studies, analysis to achieve the objectives, targets and goals and fulfils all the relevant standards and instructions gave for the client.
 Managed and led a multidisciplinary team consisting of maintenance optimization & reliability engineering professionals who perform task as PM optimization and reliability engineering studies at the project (FMEA, RCM, RAM).
 Followed up on activities relative to contractors, especially in term of preparation and management of the works.
 Supervised execution, led, of the work of other engineers
 Developed, implemented of the Mechanical Handling studies
 Led to the development, implementation of AIMS
Rotating Equipment Engineer, Commissioning Engineer Supervisor
Initec
mar 2018 - dic 2018
As a Rotating Equipment Supervisor I focused on site activities management such as planning, manpower resources/tools assignment and technical assistance to complete the work scope according to the contractual requirements.
Working as Mechanical Engineer for the Rotating Equipment in construction, pre-commissioning and commissioning activity till start-up & performances test, warranty period.
• Construction: Installation of Pumps Reciprocating and Centrifugal, Centrifugal Compressor, Installation of Fin Fan coolers.
• Pre-Commissioning: Lube oil flushing for compressor and pump as per the vendor and client requirement, start-up of motors and loop and sequence check for the instruments.
• Commissioning: Start up all the equipment as per the vendor instruction and coordinating with other disciplines for start-up activity.
• Warranty Period: Checking the equipment warranty conditions and coordinating with client and vendor.
Main Responsibilities:
 Coordinate with other commissioning disciplines (Electrical, Instrumentation, etc) to start-up, test, and troubleshoot multiple, integrated plant systems.
 Ensure vendor fabricated assemblies conform to company and industry standards (ASME, ASTM)
 I have performed pre-commissioning and commissioning activities: Walk down Inspection, Punch List, Commissioning Check List Site, Pre-start-up, conformity
 Managed mechanical commissioning team to carry out all jobs, according to Commissioning recommended procedures:
 I led and executed foundation and soft foot check and adjustments.
 Led meeting with client, sub-contractor personnel, and maintenance technicians on a regularly scheduled basis to review assignments, perform toolbox talks, provide guidance and provide pro-active resolutions.
 I led and executed assembly/installation and alignment inspections of the equipment.
 I planned and executed of all Equipment Erection & Commissioning and Maintenance Activities for Plant Rotating Equipment.
 I worked closely with planning and scheduling to ensure all needed resources are available for jobs execution and schedule expectations are met to complete the job safely & in time.
 Detailed scheduling, execution and supervision of rotating equipment according to plan, workload, resources availability and priorities to ensure plant equipment reliability and availability.
 I ensured all needed tools, equipment, and parts are readily available for scheduled jobs to achieve smooth and productive tool time.
 I reviewed and approved of all inspection and test plans and commissioning plans for entry into service
 Ensure all in-field activities are carried out safely complying with company environmental Health and Safety (EHS) guidelines and procedures
Rotating Equipment Engineer, Commissioning Engineer Supervisor
Initec
abr 2017 - dic 2017
As a Rotating Equipment Supervisor I focused on site activities management such as planning, manpower resources/tools assignment and technical assistance to complete the work scope according to the contractual requirements.
Working as Mechanical Engineer for the Rotating Equipment in construction, pre-commissioning and commissioning activity till start-up & performances test, warranty period.
• Construction: Installation of Pumps Reciprocating and Centrifugal, Centrifugal Compressor, Installation of Fin Fan coolers.
• Pre-Commissioning: Lube oil flushing for compressor and pump as per the vendor and client requirement, start-up of motors and loop and sequence check for the instruments.
• Commissioning: Start up all the equipment as per the vendor instruction and coordinating with other disciplines for start-up activity.
• Warranty Period: Checking the equipment warranty conditions and coordinating with client and vendor.
Main Responsibilities:
 Coordinate with other commissioning disciplines (Electrical, Instrumentation, etc) to start-up, test, and troubleshoot multiple, integrated plant systems.
 Ensure vendor fabricated assemblies conform to company and industry standards (ASME, ASTM)
 I have performed pre-commissioning and commissioning activities: Walk down Inspection, Punch List, Commissioning Check List Site, Pre-start-up, conformity
 Managed mechanical commissioning team to carry out all jobs, according to Commissioning recommended procedures:
 I led and executed foundation and soft foot check and adjustments.
 Led meeting with client, sub-contractor personnel, and maintenance technicians on a regularly scheduled basis to review assignments, perform toolbox talks, provide guidance and provide pro-active resolutions.
 I led and executed assembly/installation and alignment inspections of the equipment.
 I planned and executed of all Equipment Erection & Commissioning and Maintenance Activities for Plant Rotating Equipment.
 I worked closely with planning and scheduling to ensure all needed resources are available for jobs execution and schedule expectations are met to complete the job safely & in time.
 Detailed scheduling, execution and supervision of rotating equipment according to plan, workload, resources availability and priorities to ensure plant equipment reliability and availability.
 I ensured all needed tools, equipment, and parts are readily available for scheduled jobs to achieve smooth and productive tool time.
 I reviewed and approved of all inspection and test plans and commissioning plans for entry into service

mechanical leader
OHL
jun 2014 - feb 2017
Main Responsibilities:
 Mechanical Leader for engineering services of a new project called Amman Strategic Reserve Terminal for Petroleum Products for the Ministry of Energy and Mineral Resources (MEMR) of The Hashemite Kingdom of Jordan.
 I led and Supervised all the mechanical activities involved in the project
 I developed and contributed in developing of the engineering activities ensure schedules, specifications, procurement packages, operating / maintenance
 Led, Dedicated to coordination the mechanical activities of the project.
 I led, Reviewed and Developed of specification, requisition for purchaser, data sheet, technical tabulation of the all mechanical equipment in the project.
 I developed and contributed in the preparation of planning of the project.
 I supported and followed up the department procurement, construction planning and all the discipline involved in the project.

Maintenance & Reliability and Coordinator
Initec
abr 2010 - abr 2014
Main Responsibilities:
 Supervised execution, compliance, and results of the management of Reliability and Maintenance requirements developed by the contractor such as Reliability Availability and Maintainability (RAM) analysis, RCM, RBI analysis, operations/maintenance data management; Computerized Maintenance and Materials Management System (CMMMS) development; maintenance routines development; maintenance procedures development, development of warehousing systems and procedures, criticality analysis, categorization of maintenance activities, spare parts and standardization.
 I participated and contributed in developing Operability Assurance plans, schedules, specifications, procurement packages, operating / maintenance
 I developed of specification and implementation of standardization, spare parts definition and selection.
 I developed of tag asset registries, equipment / spares catalogues and maintenance management systems.
 I participated and contributed in the preparation of detailed Commissioning, start-up, test run, and handover plans commencing with detailed design.
I supported the construction, transition to operations and start–up of the facilities
Rotating Equipment Specialist, Senior. Rotating Engineer (PMC Position)
FLUOR
ene 2007 - mar 2010
Main Responsibilities:
 I led and supervised of FEL, Basic Engineering and Detailed Engineering development by Foster Wheeler and Intecsa for Crude, Vacuum Distillation, Delayed Coker, Coker Gas, (FCC), Merox, Sulphur, Hydrogen and Cogeneration Units, for REPSOL Cartagena Refinery Project (C10)
 I led and supervised of detail engineering and procurement management.
 As PMC engineer, coordinated and managed the development of Detail Engineering according with the instruction of the client.
 Strengthened the relationships with the licensors, suppliers and the project as focal point of contract
 I ensured the complying with the standards, specifications and instructions of the project and the instructions of the client-
 I coordinated and participate the technical meetings with the suppliers and the client.
 I contributed to projects targets and led a team initiative to increase productivity.
Rotating Equipment Engineer
TECNICas reunidas
ene 2005 - ene 2007
Main Responsibilities:
 I developed prepared the specifications, requisitions  I developed the data sheets for, pumps and other rotating equipment  I developed the technical evaluation / clarification of supplier bids, plus the technical reports to support order placement  Reviewed and verified of equipment supplier’s engineering, as well as the testing and commissioning proposals of equipment  Familiarity with the following codes: ISO and ASME
Rotating Equipment Engineer
Ameriven Oil Company; Venezuela
2004 - 2005
Main Responsibilities:
 I reviewed the diagnostic, troubleshooting and failure analysis of rotating equipment (Up grader)
 I reviewed and approved the site inspection, pre-commissioning, pre and start up of rotating equipment
Maintenance Planner
Fertilizing Complex; Caracas, Venezuela,
feb 2003 - abr 2004
Main Responsibilities:
 Led all RCM studies of the complex
 I prepared, reviewed and approved the maintenance plans definition using Reliability Centered Maintenance methodology (RCM)
 I developed the routes sheets and schedule preparation of all maintenance activities in to SAP-PM.
 I designed PM/PdM programs for all critical machinery
 I performed and coordinated the Reliability Center maintenance (RCM) processes and tracks the implementation of recommendations through resolution.
 I supported and assisted Maintenance Department annual goals
 I provided direction to Maintenance as required
 Instructor in seminars of RCM
 I performed support and assist in the development and implementation of Refinery Wide Preventive Maintenance (PM) Program and Refinery Wide Predictive Maintenance (PdM) Program
Rotating Equipment, Reliability Engineer Leader
PDVSA-Intevep; Caracas-Venezuela
ene 1991 - ene 2003
Main Responsibilities:
(A research affiliate of PDVSA – the Venezuelan state own oil company)
 Leading a Rotating Equipment group, Provided Engineering leadership to coordinate design all project activities
 I led for rotor dynamics analysis for PDVSA inside the rotating group.
 I managed technical support multidisciplinary projects
I performed and coordinated the Root Cause Analysis (RCA) processes and tracks the implementation of recommendations through resolution, and Reliability Center maintenance (RCM), on Rotating Equipment.
 I led conducted the life cycle cost analysis on new and critical equipment
 I assisted in spare parts review for ensuring equipment maintainability and availability
 I improved operational, safety and mechanical performance (reliability) of existing rotating equipment, Participated in Reliability Operational projects
 Instructor in seminars of reliability analysis for the oil industry

Refinery Mechanical Engineer
PDVSA; Amuay and El Palito Refinery, Venezuelan state own oil company
ene 1987 - feb 1990
Main Responsibilities:
 I participated in plant repairs and overhauls as a plant engineer
 I solved day-by-day mechanical problems in several plants of the refinery-.
Many of these actions improved mechanical and plants performance.
Quality Control Manager,
Sulzer, Pump Manufacturer, Venezuela, Worthington Pump manufacturer, Venezuela
feb 1983 - mar 1987
, 1986-1987
, 1983-1986

Main Responsibilities:
 I led the Quality and assurance control area of the pump factory
 I elaborated, implemented of the quality control manual of the factory
Formación
master
niversidad Católica Santa Teresa de Jesús de Ávila, Ávila, Spain,
sep 2009 - sep 2010
Master in Maintenance Management, Universidad Católica Santa Teresa de Jesús de Ávila, Ávila, Spain,
Mechanical Engineering;
Universidad metropolitana
abr 1979 - abr 1983
Bachelor 
Idiomas
español - materno
ingles - avanzado
Otros datos
curso varios
Technical and Professional Training:_________________________________
 H2S Certifícate. Tecnicas Reunidas. Abu Dhabi. 2017
 TBOSIET. Tecnicas Reunidas. Abu Dhabi. 2017
 System Reliability Analysis, Tennessee, 2002
 Cause Root analysis, Caracas, Venezuela 2002
 Workshop APT, Lifespan, Stock Schedule, Caracas, Venezuela, 2001
 Conferencia de Confiabilidad Operacional, Caracas Venezuela, 2000
 Gas Turbine, Puerto La Cruz, Venezuela, 2000
 Multiphase Pumping, Puerto La Cruz, Venezuela, 2000
 Cost Risk benefit optimization, Caracas, Venezuela 2000
 Reliability Centered Maintenance, RCM, Maturin, Venezuela 1999
 Pipe Design. Caracas Venezuela, 1999
 Rotor Bearing Dynamic (Rotor dynamics), Virginia USA 1988
 Vibration in reciprocating and rotating machinery and piping. Caracas, Venezuela 1997
 Financial Vision, Caracas Venezuela,1997
 Blade and rotor Dynamics of turbomachines, Caracas Venezuela, 1997
 Mechanical Seals, Caracas Venezuela, 1996
 Liderazgo, IESA Caracas Venezuela, 1996
 Planning and control de Projects. Caracas, Venezuela 1996
 13th Pump and Turbomachinery Symposium, Texas A&M University, Houston Texas 1996
 Centrifugal Pump and Systems Interaction Texas A&M Houston Texas USA, 1996
 24th Symposium Turbomachinery, Texas A&M Houston Texas USA, 1995
 Reciprocating compressors, Texas A&M Houston Texas USA, 1995
 V Congress of Turbomachinery Latinoamericana, Acapulco México, 1995
 Centrifugal and axial compressors, Venezuela 1994
 Compressor Sizing and Selection & Fundamentals of centrifugal compressor design, Caracas Venezuela 1994
 Oral Presentation, Caracas Venezuela, 1994
 Quality Assurance, Caracas 1993
 Comunicación y Asertividad, Caracas Venezuela, 1992
 Applied Positive Displacement Pump technology. Caracas, Venezuela 1992
 Seminar of centrifugal pump (Gould, Prime). Caracas, Venezuela 1991
 Applied Centrifugal Pump Technology, Caracas, Venezuela 1991
 Cost Estímate. Puerto La Cruz, Venezuela 1990
 Inspection welding. Caracas, Venezuela 1987
 Pipe Flexibility. Judibana, 1987
 Selection and Design of Vertical Pumps. Caracas, Venezuela 1985
 Tutorial in Piping Flexibility Analysis – Peng Engineering
 Quality Control. Caracas, Venezuela 1984
 Electric Motor, installation. Caracas, Venezuela 1984