Hvac
Ion*** ***** (XX años)
HVAC Construction Specialist en ENGIE GmbH, Germany Ulm, Genesis Biopharma Project
Residente fuera de España
|
Experiencia
HVAC Construction Specialist
ENGIE GmbH, Germany Ulm, Genesis Biopharma Project
jun 2020
-
sep 2020
Daily work permits issuing/signing-off according to area priorities and planification, supervision and coordination of subcontractors for the correct and timely installation of Air Handling Units,control panels,fire dampers,air supply duct, air supply thermodinamic treatment duct,recirculation air duct,smoke evacuation air duct,extraction air duct,extraction air special material duct, HVAC duct components and accessories,chillers,chilled water piping,for the new TEVA factory including bioreactors area,claning rooms,production lines, offices and utiliities,in accordance with the planning,drawings,data sheet equipment, standards,technical specifications and HSE. Calculation and planning of man powers for each operation must be performed in accordance with HSE and work safe practices, drawings, technical details, data sheet equipment, standards and customer indications Drawing verification,duct segments,and work planning for the new HVAC duct lines to be installed,checking, coordinating, ordering pipeline segments, components and accessories in accordance with the progress of works and planning Checking the list of existing materials, which will arrive, their location and storage in the warehouse or in the place where they will be mounted in accordance with the progress of the works and needs of the site Checking the list of existing materials or which will arrive, their location and storage in the warehouses or in the place where they will be mounted in accordance with the progress of the works and needs of the site Distribution of people and moving of work teams for dusct insulation,duct installation, duct components and accessories in accordance with 2 weeaks ahead planning Verification, control and resolution of all clashes with other disciplines, in particular, electric, chilled water piping, fire fighting, smoke detection, water network, false ceiling systems Preparation of HVAC duct lines for air leak test, verification and presence during tests, signing of QC forms related to the performed tests; in case of test failure, the HVAC duct lines checked, disassembled,restored and tested again. Red mark-up drawings followed by their sending to the Engie Stuttgart engineering office for AS BUILT updating drawings Due to the advanced progress of the works already made, Engie decided to make budget and staff cuts, so I was put on the list of mobilizations; having an undetermined period work contract,at the customer's disposal,I was demobilized with the agreement of both parties.
HVAC Construction_Commissioning Engineer
Saipem Kuwait , Al-Zour Refinery_Tank Farm&Utilities
feb 2020
-
may 2020
Key role and interface between Saipem HQ Italy,IMESA (vendor and module supplier) and KIPIC regarding clarifications, signing and closing of all PL for HVAC systems from the point of view Engineering, Construction, Installation, Commissioning,Start-up and Hand-over . Responsible for clarification, completion and signing of all HVAC and system interfaces Punch List 4 substations and 6 field auxiliary buildngs.Supervision and coordination of HVAC vendor for testing and commissioning of HVAC systems for the mentioned buildings.Verification, approval/modification of control system (Siemens HMI),PI&D,Cause &Effects Diagram for HVAC System and System Interfaces . Verification of the HVAC Engineering documents and contracts of the vendors, contract compliance related to the performed and future activity.’’AS BUILT drawings updating and complete/detilaed reports to Saipem Italy regarding the changes that need to be made, the disciplines involved, the impact and the number of men hours for the HVAC system. Inspections Completion Systems and ITR signing -off for all the mentioned SS / LER. Walk down with the client for HVAC systems,PL clarifications,signing-off;verification / issuance of certificates of conformity of HVAC systems. I personally(due to COVD19, the Italian vendor could not return to the project, on the territory of Kuwait)after all the final checks and tests, I energized the HVAC control panels and started the HVAC systems for 6 substations (4 were left with some problems) in manual and automatic mode,were tested in the cooling / heating cycles according to the project requirements and technical specifications and handed over to the KIPIC client. Due to the multiplication of COVID-19 cases, the continuation of the project was stopped by the decision of the government, Kuwait entering in total quarantine;my self and other few Romanian colleagues, with the approval of the Saipem management,returned with a special flight organized by the Romanian Embassy in Kuwait
HVAC Commissioning Manager
SITIE Italy/Siemens Dubai, Jabel Ali Power and Desalination Plant Extention Project
jul 2019
-
sep 2019
Brought on board for a short term contract(the former commissioning manager left urgent due to family problems)to spead-up the commissioning activities by issuing/submitting to Siemens,Mott MacDonald.DEWA (including chiller plant,chilled water system )and interface Systems, all the OTP and FTP power plant buildings, taking in consideration/analyzing BMS for each building and interfaces with ICSS, DCS in relation to functional specifications, narrative control, causes and effects, logical diagrams,at the same time with walk downs and signing-off the papers for the following buildings: 70UMA Steam Turbine Building,70UMA Steam Turbine Building for PGB Cooling System 71UMB - 72UMB Gas Turbine Building,70USX Chiller Plant Building,70UBA01 Switchgear Building,70UBA02 Switchgear Building Steam Turbine,70UBN Emergency,Diesel Generator Building70UEN03 Fuel Gas Compressor Building,71UBA11 Power control Centre (HRSG), 72UBA11 Power Control Centre(HRSG),70UYB Operator Facility Building . Weekly meeting with Siemens concerning commissioning activities and then Project Management Meeting with Siemens,Mott MacDonald and DEWA Client . Participated in all the functionality tests of the HVAC Systems Control Panels and Chillers Plant,Chilled Water on site,together with Commissioning Engineer, and Siemens, Mott MacDonald, DEWA representatives. Due to SITIE’s financial blocage,Siemens decided to take over with his people and local sub- contractors the completion of the commissioning phase.this employment contract could not be extended as SITIE’s intention.
HVAC-MEP Head Department
Total E&P Algeria -TEPA , Timimoun Field
abr 2017
-
mar 2019
During two Algeria Project rotations I got updated with the entire Project (un ultra modern Camp Life with 18 buildings) including Project Design,Tenderings and all the signed Contract’s aspects between Total/Sonatrach/CESA Algeria (GTIM Group) and the Main Contractor BUTEC/Inerga Lebanon-Algeria. July 2017 I started the Engineering phase in Lebanon and present in Beirut BUTEC offces being responsible of HVAC-MEP Department.Reviewing/commenting of all the BUTEC Engineering documents,drawings,calcullations,isometrics,arhitectural,civil,structure equipment,materials,solutions under rev 00……till IFC for Mechanical/HVAC systems and Mechanical Packages . Weekly meeting with BUTEC HVAC/Mechanical department regarding the issued documents and my comments related to their implementation for the next revision. Responsible for rewiew and approval all necessary Engineering Phase Client side (later on for Timimoun site all the phases till Start-Up ) for the entire New Camp Life (18 buildings/600 persons +) buildings and mech.packages including great Mosque and indoor Swimming Pool- HVAC Systems, Firefighting Systems ( Inergen System, Kitchen Hood Fire System, Transformers Sprinkler System…..etc),Fire Detection Systems,Hot and Cold Water Network Systems , Wastewater System/Drainage/Sewerage ,Irrigation Systems,Water Treatment Plant/Package, Sewage Treatment Plant/Package,Booster Pumps/ Packages , Waste Macerator/Compactor Package, Waste Incinerator Package,according to Design,TOTAL GS’s Data Sheet Equipment ,Project Specifications, Technical Details,Standards and HSE . I intervened, accepted, rejected or modified as appropriate the calculation note documents along with the selection of Mechanical and HVAC equipment and mechanical packages mentioned above. Returned in Algeria Timimoun site where Engineering phase continues in the same time with erection of buildings and installation of equipment. Due to not very much experience,I intervened in Contractor side responsabilities,in all the enngineering aspects.later on, all the purchasing orders for HVAC /Mechanical Equipment and Packages were verified,accepted or rejected by case,I led the PO System to comply with Total's GS and Techinical Specifications, I controled everything to avoid any mistakes and deviations of standards and_or non compliances,taking in consideration all the aspects for the future stages (Installation, Commissioning,Start-up si Maintenance ). Responsible for QA-QC sistem approval,rejection,modification form,inspections related to HVAC systems and Mechanical Packages,present in all the inspection and sign-off the QA-QC Forms;coordonate solutions for disciplines clashes later on,the drawings were modified and I approved ''AS BUILT '' Sent in missions,responsible,coordonating and present as FAT witness from Total side,for all the above mentioned packags in different countries,including a number of 41 AHU’s fabricated by Daikin in Italy. I have began preparing the pre-commissioning plan issuing all the Test Shets for HVAC and mechanical equipment for all the buildings according to technical data sheet, technical specifications and project requirements . Due to the engineering and construction phase delays, budget cuts and some misunderstandings between Total and Sonatrach, the pre and commissioning phase remained to be completed with Vendors and local Sub-contractors
HVAC Commissioning Leader/Superintendent
TOTAL Norway - Poland Gdansk Shipyard, FSO Martin Linge Conversion Project
mar 2016
-
dic 2016
Checking/reviewing/updating HVAC Engineering Design Drawings(D&ID,Block Diagram,Air flow Diagram. Mark-up Drawings….etc), all the HVAC Engineering drawings updating including Marine F&G System, Fire Fighting System,Monitor and Control System under normal and emergency situations according to existing systems/equipment,system modification or refurbished,site conditions and new sytems/project requirements . Inspections/verifications ensuring that HVAC equipment and systems have been installed in compliance with the standards, project requirements and technical specifications being ready for pre-commissioning.Involved and present on HVAC pre-commissioning activitiy for all the HVAC equipment check sheets signing-off the papers,rejections or NCR (non conformity reports ) issuing and mentioned/added in punch list FSO HVAC FTS and OTP for all the systems/sub-systems preparing/issuing under IDC status and after comments/acceptance new status/codes issued according to OPERCOM . System and sub-system identifications/limits;Preservation Check Lists creating/issuing for existing HVAC systems/equipment. HVAC tagging equipment for existing and new equipment, ICAPS Data Base populating ;FSO HVAC Pre and Commissioning procedures issuing for all the systems,dossiers preparing . On Total’s request involved in HVAC Engineering drawings checks/ comments for HVAC Novenco (sub-contractor)Engineering documentation ,solutions and aprovals. Atended to meetings/video conferences between ICE Design Company/KNOT/ Remontowa /Novenco (Denmark sub-contractor)with regrds to FSO HVAC existing/modifications and new systems . Commissioning Dossiers preparing/issuing and Completion documents ;Vendor supervising/ Coordonating activity,Work safe practices controling ,Work Permits issuing for existing system modification or newequipment installing;Non Conformity Reports for installed equuipment Walk-downs ,Punch List issuing/Clarifications/Signing off;FAT/SAT Witness for test equipment,work paperscompleting/signing off .
HVAC Engineer
Technip KSA, KCROP Al Khafji KJO/Saudi Aramco Project
mar 2015
-
ago 2015
On-shore and off-shore Refurbishment Project in Khafji Field (totally shut-down)for LQP (Living Quarter Platform)and OCP (Off-shpre Control Platform)Platforms.Involved in Engineering Design/Demolition/Construction/Modifications and QC as well. Checking/review Engineering documents issued by Design Company related with KJO Project Requirements/Standards and Technical Specifications.Missions in Technip main Office Abu- Dhabi with Petra project design company and Chalmers Sub- contractor meetings (MOM’s)direct drawing updating/solutions/professional discussions. Off-shore platformvisits/surveillance with Chalmers Sub-contractor and at place discussion,planning future steps and stages,changing recomandations;new issued drawings updating by my self according to site issues and discipline interconnectiions. FMR’s issuing according to project requirements and standards ,follow-up FMR’s,interfaces with Procurement Departement,bid’s,costs.Bill of Quantities /Delivery List,Shipping Materials List Checking/reviewing for oredered equipment/materials .Visits/meetings in Jubail/Al Khobar Manufacturers for HVAC equipment equipment ordered checkingupdating,corrective actions by case and reporting to Managers and Project Director.Internal QC Forms /inspections issuing for the delivered equiment and material available and pending in Logiscs Yard;KJO RFI issuing acceptance and and signing off for the inspected/accepted equipment and materials,QC dossiers issuing and records. OFF/SHORE:Supervising/coordonating demolition works,then,RFI’s issuing QC internal inspections /signing off forms,client inspections and signing off prior to new installations. Temporary HVAC units installing ,temporary generators, supervising/ccordinating duct site fabrications according to standdards and project requirements. Discipline/system interfaces, solutions ,clashes,mark-up,modifications,’’As Built ‘’drawings, QC Inspections/RFI’s and signing off for al new installed equipment.Installing of new HVAC Equipment according to project rquirements and standards,discipline interfaces.Preservation activities for Piping,Mechanical Electrical,HVAC,Instrument systems.Mechanical Completion, and pre-ccommissioning activityies .Vendors activity coordonation,daily staff meeting and weekly Safety Meeting attended, daily work reports sent to OIM,Project Manager and Project Director.
HVAC Commissioning Engineer
Imtech Marine Netherlands/Germany North Sea Wind Farm Platform
dic 2014
-
ene 2015
I have been hired for a very short term but very important role by Imtech Marine Holland (via Progressive Global Energy and Natural Resources Netherlands )especially for HVAC Air Balancing all the platform rooms according to preject request,P&ID,HVAC Ducting Drawings for each system,technical Details and Specificatins (the winter holidays period ,especially chosen) .I spent one day i Imtech Marine Netherlands offices on meeting with managers for project requirements, project updating and familiarisation,than travel into Wilhelmshaven Germany-Helwin Beta the client being Heerema Marine Contractors.The HVAC systems were successful balanced, daily work progress report sent into Imtech Marine Project Manager and Heerema Client representatives as well.
Electrical Commissioning Superintendent
Total E&P Moscow Russia, LNG Kharyaga Phase III upgrading Russia
abr 2014
-
jul 2014
Engaged by SNC Lavalin France for Electrical Pre-commissioning/Commissioning Engineering Kharyaga Project Phase III in Moscow TOTAL’s offices . Technical documentation and specifications reviews,new power generation and substations SLD’s Mark-Up, electrical sub-system creating, Electrical OTP’s issuing,and procedures P&ID checks/review,FAT/SAT documents and records reviews, Data Sheet sequipment,checks OPERCOM Database for Electrical/ equipment stage, vendor documents tests,records,compliance with project request and TOTAl’s standards. Electrical TQ’s issuing in case of missing documents or non-conformity with project Request,standards,HSE and Total specifications.Electrical commissioning dossiers preparing/populating in ICAPS according to OPERCOM Methodology, TOTAL’s Procedures and Standards. Daily meeting/discussions/workshops and work progress reports sent to Lavalin/TOTAL Commissioning Manager Representative. .Since August 2014 due to delicate matters between Russia and Ukraine ,the project has been officially postponed for 1,2 years on Total’s decision.
Electrical/HVAC Commissioning/Start Up Engineer
Shell Kazakhstan , OPF Eskene West/D Island Off-shore Kashagan Field
dic 2012
-
dic 2013
Engaged by Shell/ NCPOC to assure that the Electrical and HVAC equipment has been correct installed/commissioned or in course to be commissioned according to Project request/standards,compliance with Shell standards/specifications and HSE being ready for start-up. Review Electrical /HVAC engineering documentation,as built drawings,tests, records,procedures .Preparing the Electrical/HVAC folders downloading them from IMIS/ACS Systems then walkdowns and inspectionsto into all the OPF areas and Commissioning Units including substations, instrument and HVAC rooms. PL items issuing with regards to commissioning units, non-conformity equipments and registered on ACS System. Walk downs, verifications with OPF Commissioning Teams for the PL items issued, clarifications and signing-of. Also in charge and responsible for Electrical and HVAC Commissioning Dossiers review divided by systems and subsystems;verifications for the missed documents, comments, acceptance/rejections by case then signing-off and ready for hand over .Involved as Client’s side, as witness/ support/ coordinate commissioning Electrical/HVAC equipment being un-commissioned yet. Work location changed on D Island, Off-shore on Shell’s request for helping-out the Start- up & Operate Team;walk downs. signing off for acceptance or rejections, PL’s clarification and Commissioning Dossier Reviews for Elctrical/HVAC equipment . Weekly Safety meetings/Daily Meetings in the both locations with Start-Up& Operate Team Superintendent and Managers. Returned on OPF Eskene West and role changed on Maintenance Department; Involved on Process Start-up and after a while Shut-down activities; supervising/coordinating day/night shift subcontractor Repairs/Maintenance works during process shut-down period, with regards to the different Electrical/HVAC/Mechanical appeared problems on process units train 1 and 2. Involved in supervising/coordinating, guidance and technical direction to subcontractors(ISKER and ICAT commissioning team,generally, Russian teams) for rebuilding/repairs of heat tracing and cathodic protection system failed on testing. Also, preservation/winterization activities for Piping,Electrical,HVAC systems. Work progress and reports daily sent to OPF Eskene West Maintenance Manager
HVAC Coordinator
Saipem Algeria, LNG 3Z Arzew, Oran Algeria Project
nov 2011
-
nov 2012
Engaged by Eni-Saipem Algeria to verify and coordination of running test HVAC/Instrument/ Mechanical equipments and Interface Systems already installed or in course to be install by Subcontractors, for the buildings and substations according to GNL 3Z project requirements, Standards,Drawings,Technical Specifications and HSE. Supervising, coordinating the subcontractors activity,especially installing of HVAC equipment and modifications,if required.Monitor the construction activities and provide assistance to the subcontractor to solve out the problems. Daily carry-out inspections into HVAC Package Units,Roof Top Units, AHU Units F&G System , Fire Fighting System, investigations and records with regard to each device installed, preserved and corrective actions if requested.Witness and recommendations on Chillers installing,chilled water piping flushing/pressure/leak tests and records.HVAC system running tests for each building or electrical substation performed by vendors and sub-contractors to ensure compliance withs standards. Monitoring of HVAC equipment installing for new constructed buildings, workforce productivity/progress relative to schedule; Interfaces with Sub- contractorQA/QC personnel and Engineering to address quality issues/progress and ensures compliance with specifications, procedures, and planning . Responsible of pre-commissioning check list verifications,signing-off the papers,acceptance by case for all the HVAC building systems. Checks for completed work packs, raise punch lists if appropriate,punch list acceptance/rejections by case,QC Non-Conformance and TQ’s issuing for the mentione equipments/systems and also drawings, procedures updating. Issuing of spare parts equipment for each building/area and consumables for HVAC system . Weekly subcontractors man power and works progress recording/updating in Construction Management Database and daily works progress and recommendations sent to Civil Buildings Manager.
E/I/T/HVAC Chief Engineer
Tozzi/Agip KCO Kazakhstan, A Island Kashagan Field Off-shore Kazakhstan
ene 2011
-
nov 2011
Supervising/coordinating hook-up/modifications project works for A Island local equipment rooms (LER) Electrical System, ESD System, Fire and Gas System, Fire Fighting System, HVAC System, Telecom System, ICSS interfaces, Installation of equipment, cables, control and idiscipline nterfaces for the all the mentioned systems Mechanical Completion, Pre-comm of all the items according to project specifications for each system and Eni/Agip KCO request and indicatioons.Carried out daily planning of the works and QC inspections for all the installed equipment Mechanical Completion,pre-commissioning,commissioning,preservation/winterization and start-up LER Electrical and HVAC System by temporary power load (set generators) for HVAC Room Low Distribution Switchboard. Also responsible for ITR's completing, solving out punch list items according to drawings, procedures and safety requirement. Responsible for daily leading of risk assessments and Toolbox talks in English, Italian, Russian and Romanian, and supervise/coordinate all the works performed by a couple of multicultural teams day and night shift according to Agip Safety Rules and HSE. Attended weekly or daily meetings with A Island Agip Construction Manager and Agip’s departments regarding to works plan, work schedule materials and daily works progress. Daily work reports sent to Agip Hook-up Construction Manager. The last rotation D Island QA-QC Mechanical Completions/Pre-commissioning,ITR’s,RFI’s,Punch List activities for LER’s HVAC system only.
Electrical Assessor
Petrofac Singapore/CPOC Malaysia , Kota Bahru Muda Field/Platform Off-shore Malaysia
nov 2010
-
dic 2010
Engaged on the CPOC (CARIGALI-PTTEP Operating Company) Muda Platform, Malaysia to determinate the exact level of Electrical Technicians and Team Leaders with regard to Electrical and HSE knowledge for safe platform operations; gaps found and clearly training recommendations for each candidate was recommended and indicated to Malaysia CPOC Management and Singapore Petrofac Training Centre. Personally and professionally discussions regarding their CV’s,, qualifications, years experience in oil & gas projects. Verbal and written assessments, electrical questionnaires for each Electrical Unit and records were registered for each candidate. At the end of this assessment the candidate personal folder was issued and sent to Petrofac Singapore and CPOC (CARIGALI-PTTEP Operating Company Muda Field) accompanied by training recommendations
Electrical/HVAC Maintenance Methods Engineer
Dietsamann /Sonadiets Angola Toulouse France _Pazflor FPSO Maintenance Preparation Team
sep 2010
-
nov 2010
Engaged by Dietsmann Engineering Maintenance Toulouse France for Pazflor FPSO Electrical/HVAC Maintenance dossiers reviewing and training for Electrical/HVAC Technicians arrrieved from Angola to increase their level of electrical /mechanical instrument knowledge, especially FPSO Power Generation and HVAC System.While 3 days I attemded/ completed Pazflor FPSO Operation Training cours in Total E&P Training Center Lacq France.
HVAC MMO Specialist
BP Angola FPSO Block 17 Greater Plutonio FPSO Off-shore
ago 2009
-
ago 2010
Engaged on Greater Plutonio FPSO by BP Angola and responsible for whole FPSO Maintenance and modifications HVAC systems in fully production activities. Supervising/coordinating/performing FPSO preventive, corrective and breakdown maintenance activity according to maintenance procedures, maintenance manufacturer manuals, procedures technical specifications and HSE. Supervising/coordinating vendor activity regarding to Pressure Balancing tests and corrections for Accommodation all the levels AFT/FWD Machinery Spaces ,LER’S/Modules etc… Updating FPSO HVAC System Accommodation Procedures; preparing all the requests regarding to spare parts, tools and consumables. Training activities in French or English for the HVAC local technicians Participated in the S.T.O.P and B.O.S.S Safety program and in the weekly Safety Meetings.Daily meeting with Maintenance Superintendent, daily reports regarding to HVAC maintenance activity HVAC Maintenance Planning by Work Orders, preventive, corrective and breakdown maintenance solving and solutions.
Power Generation Electrical Trainer
Dietsmann/Eni Agip Corporate University Aksai Kazakhstan KPO Karachaganak Aksai Kazakhstan
ago 2008
-
jul 2009
On classroom and on job training activities in Aksai Training Centre regarding to KPO Aksai Power Plant and Power Generation for Electrical Technicians and Junior Electrical Engineers using English and Russian Languages. Responsible for implementing a training plan. Theoretical lessons/Electrical/Instrument Course, Presentations regarding Electrical Physics, High/Low Voltage Electrical Equipments, Generators, Gas/Steam Turbines, Step-up/Down transformers,Drawings, Installing of Electrical Equipment, Preservation, Testing/Commissioning, Start-up,Protections on High/Low Voltage Equipment and Interfaces Monitor/Control of Electrical Instrument Equipments, HSE, Rules on Power Plant, Safety Electrical Rules, Safety Procedures High and Low Voltage, ROK Electrical Safety Rules-Procedures…etc. Daily Test Questionnaires given to the students, Weekly Reports regarding to our daily activity, Evidence Competence Matrix, Individual Evolution Form for each student sent to ECU Milano Italy and Agip KCO Atyrau Kazakhstan. Individual theoretical/practical final assessments by Eni/Agip KCO Assessors Team having excellent results
Electrical Commissioning Engineer
Shell Russia/Sakhalin Energy OPF Lunskoye Sakhalin Island Russia
sep 2007
-
ago 2008
Electrical commissioning and start-up activities for process, utilities and infrastructure systems associated with the Gas Processing Plant. Commissioning systems/subsystems in accordance with the Shell commissioning procedures and commissioning start-up schedule. Coordination/supervision and guidance to subcontractors related to Electrical commissioning activities divided by systems-sub systems. Involved in Vendor supervising/ coordonating activity for Booster Pump Motors, Synchronous Motors-Lube Oil system,DC/AC Circuits,Variable Frequency Starting/Speed Control,Excitation Systems,Auxiliary Circuits….etc. On Shell’s request position changed – Preservation Commissioning Engineer- Responsible for the execution, testing of constructed/commissioned Electrical/HVAC equipment, systems and materials meet defined preservation standards. Supervising-coordinating preservation Russian teams activities issuing ISSOW Work Permits and SAP Maintenance Work Order Forms for preservation/winterization activities during commissioning activities till hands on to operations. Daily, control and monitor for all the installed equipment for winterization and maintenance and corrective action by case. Providing Electrical/HVAC Preservation Certificates and supporting documents for all the subsystems to Completions File. Daily meetings and Reports sent to Commissioning Manager regarding the Electrical/HVAC System Progress and Electrical /HVAC Preservation/Winterization activities.
Electrical Engineer
Amec Spie/Total Angola Gas Pipeline/New Life Camp
abr 2007
-
sep 2007
Responsible for all Electrical/Air Conditioning works –Design/Installing/Preservation/ QA-QC,Commissioning/Start-up to a new Life Camp and Cathodic Protection Pipeline works located in Soyo town (onshore) Angola. Coordination, technical direction and support to subcontractors with regards to pipeline cathodic protection electrical equipment installing/ commissioning according TOTAl’s GS’s and Procedures,Standards,HSE,Technical Details and Instructions. Personal design of electrical systems, cable sizes, routes, electrical control panels, coordinating and supervising electrical works for new camp life Offices and Utilities (including set generators and substation, installing electrical equipment protection lighting and lightning systems)ensuring that the works comply with TOTAL requirements, GS’s, Procedures, project specifications, standards and HSE. Daily work progress sent to Construction Manager and weekly management meetings with Total E&P Angola
Electrical Engineer/Manager
Takenaka Europe GmbH Calsonic Kansei New Factory Ploiesti Romania
abr 2006
-
mar 2007
Responsible to review and approve electrical/instrument P&ID and drawings, installing of electrical Instrument equipment preservation, testing and commissioning of electrical equipment including power station to ensure that the subcontractor's works complies with the project specifications,standards,updated contract drawings,technical details and terms of execution. Providing engineering design guidance and designed drawings verification including: Single Line Diagrams, Transformer Station Drawing 20Kv/0,4Kv, Power,Instrument and Control Layout Drawings, Cablle Trays & Conduit Layout Drawings, Lighting &Grounding Layout Drawings, Cable & Conduit Schedules, Control Schematics & Wiring Diagrams and Electrical /Instrument Specifications.Carry out works in accordance with project and client engineering HSE,QA-QS and report progress and problem areas related to the execution of the work. Daily meetings with Japanese Staff and weekly HSE meetings.
HVAC Maintenance Specialist
Sabratha Gas Platform off-shore Libya
sep 2005
-
abr 2006
Engaged and responsible for HVAC maintenance preventive/corrective and breakdown maintenance activities.Supervising/coordinating maintenance activity and solve-out all the appeared troubleshooting; daily work permits depending of priorities; daily reports regarding system problems and solutions to platform Maintenance Superintendent .Training activities for Libyan Nationals with regard to HVAC systems, system Interfaces, Work orders, Procedures, HSE and work safe practices, Electrical/HVAC Safety Rules…..etc
Electrical/HVAC Manager
SOGEC Gabon Afica Site Gabon President Palace
abr 2005
-
sep 2005
Engagd and responsible for all project coordonation Construction, QA QC, Commissioning & Start Up Electrical / HVAC system,Diesel Genarators, Air Condition System, TV System, Telephone–Lan system, system interfaces,external-internal lighting system.lightning sustem 6Kv/0,4 Kv substation for Gabon President Palace in Oiem town at over 600 Km from central office SOGEC Libreville. Daily meeting with team leaders with regrads to planning/work progress,appeared problems,modifications.solutions,drawings updating .Daily supervision/coordonation all the works to assure that the project comply Project Design,Project Standards,Equipment, Project Specifications,Planning ,Procedures,HSE and Work Safe Practices.. Review the project budget accorded,project steps execution,work schedule, manpower, and prorities,daily/weekly work planning, tools,materials, cars fuel and maintenance costs material suppliers and prices invoicies,receipts; in addition in charge with work contracts and weekly salaries for locals personel,providing in advance accommodation (rented houses,meals,transportation in-out site/town )for SOGEC personnel arrived from main office Libreville;permanently and full time focused/connected on project. Daily/weekly work reports sent to SOGEC Libreville Project Director .
Electrical/HVAC Engineer
Bouygues Turkmenistan _Turkmenistan Maintenance President Palace
oct 2003
-
abr 2005
Chosen and involved in a very delicate and important position, where the activity of the maintenance team and the demands of the Turkmenistan president regarding utilities were controled and monitored either day or night from hour to hour by the security team of the presidential palace. Day to day maintenance activity for the technical building and utilities of the Turkmenistan presidential palace (Archabil_Firuza), composed of HVAC Chillers Plant and 15 AHU, Power Plant 6Kv / 0.4 Kv,Water Producing and Treated Plant, Sewage Plant, Waste Plant and System interfaces, all the above computerised systems,in accordance to Procedures, Maintenance Manuals Technical/Safety Specifications and Standards . Responsible for entire palace maintenance daily works for the above plants and systems, monitoring plant parameters taking the right steps/decisions for corrective actions, if necessary; daily work permits issuing, identifying of any risks which may effect the work schedule or maintenance activities; daily report reports to Maintenance Coordinator. Responsible for all field operations in power station(high,medium,low voltage) water production and treatment, HVAC Rooms, Risk Assessment, Hazards and Controls. Work location changed and involved in Electrical/HVAC Commissioning activities for Commercial Bank, Exhibition Palace Ashgabat City ,buildings with over ten floors.
Chief Site
Oztasar UK New Factory Ploiesti City Romania
ago 2000
-
sep 2003
Responsible for all site Hook-up/Construction ,QA-QC,Commissioning, Start-up Electrical/Diesel Generators/HVAC/AC works and system interfaces to the new ready-made clothes manufacturer (4 phases) production halls, offices and utilities in accordance with the Project Design,Standards,Procedures,Technical Instructions, and HSE.Daily/weekly meetings, regarding work progress,Daily Reports sent to Project Director and Client/Owner as well.
Electrical Coordinator
DIS Interplast Italy _New Factory Filipesti Targ, Prahova County, Romania
jul 1999
-
ago 2000
: Engaged and responsible for supervision/coordonation Construction, QA-QC, Pre-commissioning, Commissioning and Start-up Electrical/HVAC,Diesel Genarator systems, Boiler/Steam Plant/stean piping network, and system interfaces for new plant plastic hangers and devices,production halls,offices and building utilities according to the Project Design, Standards,Procedurres,Technical Instructions, and HSE. .Daily/weekly meetings, regarding work progress,Daily Reports sent to Project Manager and Client/Owner as well
Lead Electrical Shift
Luk-Oil Refinery Ploiesti City Romania_Power Plant Maintenance and Repairs
oct 1978
-
jun 1999
Supervising/coordinating and responsible for all the maintenance works and H/L voltage equipment repair activities in power stations 400Kv/110Kv and 6Kv/0,4Kv.Servicing, repairing , intervention and maneuvers 6kv/0.4kv permanent electricity provided for production plants.Shutdowns power plant periodically for planned maintenance activities. Work place changed in the Main Power Plant 400kv/110kv; more than 10 years serviced in LNG/Gas Plant/Sulphur Plant and over 20 years involved in the majority power plants from Luk-Oil Refinery including the main work shop engines/motors repairs and H/L voltage Power Stations electrical equipment repairs.
Site Electrical Technician
TIAB/OMW Refinery Ploiesti City Romania, Electrical Power Station Site
Installing/testing of all the electrical and instrument equipment for a new Gas Plant Power Station; mounting of H/L voltage cells,step-up/down transformers bus bars and duct bars, grounding, lighting and lightning system, UPS,bank batteries and connections,instrument and control cables, panels,protection system, fixtures, cable terminations, cable connections,machinery equipment,emergency diesel generators and accesories......etc ,according to Drawings,P&ID,Technical Specifications, Data Sheet Equipment,Vendor Manuals,Procedures,HSE and safe work practices.
Currículums relacionados