Hvac

Ion*** ***** (XX años)
HVAC Construction Specialist en ENGIE GmbH, Germany Ulm, Genesis Biopharma Project
Residente fuera de España
|
Experiencia
HVAC Construction Specialist
ENGIE GmbH, Germany Ulm, Genesis Biopharma Project
jun 2020 - sep 2020
Daily work permits issuing/signing-off  according to area priorities and planification,
                        supervision and coordination of subcontractors for the correct and timely installation of 
                        Air Handling Units,control panels,fire dampers,air supply duct, air supply thermodinamic 
                        treatment duct,recirculation air duct,smoke evacuation air duct,extraction air duct,extraction 
                        air special material duct, HVAC duct components and accessories,chillers,chilled water 
                        piping,for the new TEVA factory including bioreactors area,claning rooms,production lines,
                        offices and utiliities,in accordance with the planning,drawings,data sheet equipment,
                        standards,technical specifications and HSE. 
                        Calculation and planning of man powers for each operation must be performed in accordance 
                        with HSE and work safe practices, drawings, technical details, data sheet equipment, standards 
                        and customer indications
                        Drawing verification,duct segments,and work planning for the new HVAC duct lines to be 
                        installed,checking, coordinating, ordering pipeline segments, components and accessories in 
                        accordance with the progress of works and planning
                        Checking the list of existing materials, which will arrive, their location and storage in the 
                        warehouse or in the place where they will be mounted in accordance with the progress of the 
                        works and needs of the site
                        Checking the list of existing materials or which will arrive, their location and storage in the 
                        warehouses or in the place where they will be mounted in accordance with the progress of the 
                        works and needs of the site
                        Distribution of people and moving of work teams  for dusct insulation,duct installation, 
                        duct components and accessories in accordance with 2 weeaks ahead planning
                        Verification, control and resolution of all clashes with other disciplines, in particular, electric, 
                        chilled water piping, fire fighting, smoke detection, water network, false ceiling systems
                        Preparation of HVAC duct lines for air leak test, verification and presence during tests, signing 
                        of QC forms related to the performed tests; in case of test failure, the HVAC duct lines 
                        checked, disassembled,restored and tested again.
                        Red mark-up drawings followed by their sending to the Engie Stuttgart engineering office 
                        for AS BUILT updating drawings 
                        Due to the advanced progress of the works already made, Engie decided to make budget and 
                        staff cuts, so I was put on the list of mobilizations; having an undetermined period work 
                        contract,at the customer's disposal,I was  demobilized with the agreement of both parties.
HVAC Construction_Commissioning Engineer
Saipem Kuwait , Al-Zour Refinery_Tank Farm&Utilities
feb 2020 - may 2020
Key role and interface between Saipem HQ Italy,IMESA (vendor and module supplier) and 
                        KIPIC regarding clarifications, signing and closing of all PL for HVAC systems from the point of 
                        view Engineering, Construction, Installation, Commissioning,Start-up and Hand-over .
                        Responsible for clarification, completion and signing of all HVAC and system interfaces Punch 
                        List 4 substations and 6 field auxiliary buildngs.Supervision and coordination of HVAC vendor 
                        for testing and commissioning of HVAC systems for the mentioned buildings.Verification,
                        approval/modification of control system (Siemens HMI),PI&D,Cause &Effects Diagram for 
                        HVAC System and System Interfaces .
                        Verification of the HVAC Engineering documents and contracts of the vendors, contract 
                        compliance related to the performed and future activity.’’AS BUILT drawings updating and 
                        complete/detilaed  reports to Saipem Italy regarding the changes that need to be made, the 
                        disciplines involved, the impact and the number of men hours for the HVAC system.     
                        Inspections Completion Systems and ITR signing -off for all the mentioned SS / LER. 
                        Walk down with the client for HVAC systems,PL clarifications,signing-off;verification /
                        issuance of certificates of conformity of HVAC systems. 
                        I personally(due to COVD19, the Italian vendor  could not return to the project, on the 
                        territory of Kuwait)after  all the final checks and tests, I energized the HVAC control panels and 
                        started the HVAC systems for 6 substations (4 were left with some problems) in manual and 
                        automatic mode,were tested in the cooling / heating cycles according to the project 
                        requirements  and technical specifications and handed over to the KIPIC client.
                        Due to the multiplication of COVID-19 cases, the continuation of  the project was stopped by 
                         the decision of the government, Kuwait entering in total quarantine;my self and other few 
                         Romanian colleagues, with the approval of the Saipem management,returned with a special 
                         flight organized by the Romanian Embassy in Kuwait
HVAC Commissioning Manager
SITIE Italy/Siemens Dubai, Jabel Ali Power and Desalination Plant Extention Project
jul 2019 - sep 2019
Brought on board for a short term contract(the former commissioning manager left urgent
                         due to family problems)to spead-up the commissioning activities by issuing/submitting to 
                         Siemens,Mott MacDonald.DEWA (including chiller plant,chilled water system )and interface 
                         Systems, all the OTP and FTP power plant buildings, taking in consideration/analyzing BMS for 
                         each building and interfaces with ICSS, DCS in relation to functional specifications, narrative 
                         control, causes and effects, logical diagrams,at the same time with walk downs and signing-off 
                         the papers for the following buildings:
                         70UMA Steam Turbine Building,70UMA Steam Turbine Building for PGB Cooling System
                         71UMB - 72UMB Gas Turbine Building,70USX Chiller Plant Building,70UBA01 Switchgear 
                         Building,70UBA02 Switchgear Building Steam Turbine,70UBN Emergency,Diesel Generator 
                         Building70UEN03 Fuel Gas Compressor Building,71UBA11 Power control Centre (HRSG),
                         72UBA11 Power Control Centre(HRSG),70UYB Operator Facility Building .
                          Weekly meeting with Siemens concerning commissioning activities and then Project        
                         Management Meeting with Siemens,Mott MacDonald and DEWA Client .
                         Participated in all the functionality tests of the HVAC Systems  Control Panels and Chillers
                         Plant,Chilled Water on site,together with Commissioning Engineer, and Siemens,
                         Mott MacDonald, DEWA representatives.
                         Due to SITIE’s financial blocage,Siemens decided to  take over with his people and local sub-
                         contractors the completion of the commissioning phase.this employment contract could not be 
                         extended as SITIE’s intention. 
HVAC-MEP Head Department
Total E&P Algeria -TEPA , Timimoun Field
abr 2017 - mar 2019
During two Algeria Project rotations I got updated with the entire Project (un ultra modern 
                         Camp Life with 18 buildings) including Project Design,Tenderings and all the signed Contract’s
                         aspects between Total/Sonatrach/CESA Algeria (GTIM Group) and the Main Contractor 
                         BUTEC/Inerga Lebanon-Algeria.
                         July 2017 I started the Engineering phase in Lebanon and present in Beirut BUTEC 
                         offces being responsible of HVAC-MEP Department.Reviewing/commenting  of all the BUTEC 
                         Engineering documents,drawings,calcullations,isometrics,arhitectural,civil,structure 
                         equipment,materials,solutions under rev 00……till IFC for Mechanical/HVAC systems and 
                         Mechanical Packages .
                         Weekly meeting with BUTEC HVAC/Mechanical department regarding the issued documents 
                         and my comments related to their implementation for the next revision.
                         Responsible for rewiew and approval all necessary  Engineering Phase Client side (later on for 
                         Timimoun  site all the  phases till  Start-Up ) for the entire New Camp Life (18 buildings/600
                         persons +) buildings and  mech.packages including great Mosque and indoor Swimming Pool-                           HVAC Systems, Firefighting Systems ( Inergen System, Kitchen Hood  Fire System,
                         Transformers  Sprinkler System…..etc),Fire Detection Systems,Hot and Cold Water Network
                         Systems , Wastewater  System/Drainage/Sewerage ,Irrigation Systems,Water Treatment 
                         Plant/Package, Sewage Treatment Plant/Package,Booster Pumps/ Packages , Waste 
                         Macerator/Compactor Package, Waste  Incinerator  Package,according to Design,TOTAL GS’s 
                         Data Sheet Equipment ,Project Specifications, Technical Details,Standards and HSE .
	I intervened, accepted, rejected or modified as appropriate the calculation note documents 
                         along  with the selection of  Mechanical and HVAC equipment and mechanical packages 
                         mentioned above.
                         Returned in Algeria Timimoun site where Engineering phase continues in the same time with
                         erection of buildings and installation of equipment. Due to not very much experience,I 
                         intervened in Contractor side responsabilities,in all the enngineering aspects.later on, all the 
                         purchasing orders for HVAC /Mechanical Equipment and  Packages were verified,accepted or 
                         rejected by case,I led the PO System to comply with Total's GS and Techinical Specifications,
                         I controled everything to avoid any mistakes and deviations of standards and_or non 
                         compliances,taking in consideration all the aspects for the future stages (Installation,
                         Commissioning,Start-up si Maintenance ).
                         Responsible  for  QA-QC sistem approval,rejection,modification  form,inspections  related  to 
                         HVAC systems and Mechanical Packages,present in all the inspection and sign-off the QA-QC 
                         Forms;coordonate solutions for disciplines clashes later on,the drawings were modified and I 
                         approved   ''AS BUILT ''
                          Sent in missions,responsible,coordonating and present as FAT witness from Total side,for all 
                         the above mentioned packags in different countries,including a number of 41 AHU’s fabricated 
                         by Daikin in Italy. I have began preparing the pre-commissioning plan issuing all the Test Shets for HVAC and mechanical equipment for all the 
                         buildings according to  technical data sheet, technical specifications and project requirements .
                         Due to  the engineering and construction phase delays, budget cuts and some 
                         misunderstandings between Total and Sonatrach, the pre and commissioning phase remained 
                         to be completed with Vendors and local Sub-contractors

HVAC Commissioning Leader/Superintendent
TOTAL Norway - Poland Gdansk Shipyard, FSO Martin Linge Conversion Project
mar 2016 - dic 2016
Checking/reviewing/updating HVAC Engineering Design Drawings(D&ID,Block Diagram,Air 
                          flow Diagram. Mark-up Drawings….etc), all the HVAC Engineering drawings updating including 
                          Marine F&G System, Fire Fighting System,Monitor and Control System under normal and 
                          emergency situations according to existing systems/equipment,system modification or  
                          refurbished,site conditions and new sytems/project requirements . 
                          Inspections/verifications ensuring that HVAC equipment and systems have been installed in 
                          compliance with the standards, project requirements and technical specifications being ready 
                          for pre-commissioning.Involved and present on HVAC pre-commissioning activitiy for all the 
                          HVAC equipment check sheets signing-off the papers,rejections  or NCR (non conformity 
                          reports ) issuing and mentioned/added in punch list 
                          FSO  HVAC FTS and OTP for all the systems/sub-systems preparing/issuing under IDC status 
                          and after comments/acceptance new status/codes  issued according to  OPERCOM .
                          System and sub-system identifications/limits;Preservation Check Lists creating/issuing for 
                          existing HVAC systems/equipment. HVAC tagging equipment for existing and new equipment, 
                          ICAPS Data Base populating ;FSO HVAC  Pre and Commissioning procedures issuing for all 
                          the systems,dossiers preparing .
                          On Total’s request involved in HVAC Engineering drawings checks/ comments for HVAC 
                          Novenco (sub-contractor)Engineering documentation ,solutions and aprovals.
                          Atended to meetings/video conferences  between ICE Design Company/KNOT/ Remontowa
                          /Novenco (Denmark sub-contractor)with regrds to FSO HVAC existing/modifications and 
                          new systems .
                          Commissioning Dossiers preparing/issuing and Completion documents ;Vendor supervising/
                          Coordonating activity,Work safe practices controling ,Work Permits issuing for existing system
                          modification or newequipment installing;Non Conformity Reports for installed equuipment
                          Walk-downs ,Punch List issuing/Clarifications/Signing off;FAT/SAT Witness for test
                          equipment,work paperscompleting/signing off .
HVAC Engineer
Technip KSA, KCROP Al Khafji KJO/Saudi Aramco Project
mar 2015 - ago 2015
On-shore and off-shore Refurbishment Project in Khafji Field (totally shut-down)for LQP 
                        (Living Quarter Platform)and OCP (Off-shpre Control Platform)Platforms.Involved in 
                        Engineering Design/Demolition/Construction/Modifications and QC as well. Checking/review
                        Engineering documents issued by Design Company related with  KJO  Project
                        Requirements/Standards and Technical Specifications.Missions in Technip main Office Abu-
                        Dhabi with Petra  project design company and Chalmers Sub- contractor
                        meetings (MOM’s)direct drawing updating/solutions/professional discussions.
                        Off-shore platformvisits/surveillance with Chalmers Sub-contractor and at place
                        discussion,planning  future steps and stages,changing recomandations;new issued drawings
                        updating by my self according to site issues and discipline interconnectiions.
                        FMR’s issuing according to project requirements and standards ,follow-up FMR’s,interfaces with
                        Procurement Departement,bid’s,costs.Bill  of Quantities /Delivery List,Shipping Materials List 
                        Checking/reviewing for  oredered equipment/materials .Visits/meetings in Jubail/Al Khobar
                        Manufacturers  for HVAC equipment equipment ordered checkingupdating,corrective  actions 
                        by case and reporting to Managers and Project Director.Internal QC Forms /inspections  issuing 
                        for the delivered equiment and material available and pending in Logiscs Yard;KJO RFI issuing 
                        acceptance and and signing off for the inspected/accepted equipment and materials,QC 
                        dossiers issuing and records.
                        OFF/SHORE:Supervising/coordonating demolition works,then,RFI’s issuing QC internal
                        inspections /signing off forms,client inspections and signing off prior to new installations.
                        Temporary HVAC units installing ,temporary generators, supervising/ccordinating duct site  
                        fabrications according to standdards and project requirements.
                        Discipline/system interfaces, solutions ,clashes,mark-up,modifications,’’As Built ‘’drawings,
                        QC Inspections/RFI’s and signing off for al new installed equipment.Installing of new HVAC
                        Equipment according to  project rquirements and standards,discipline interfaces.Preservation 
                        activities for Piping,Mechanical Electrical,HVAC,Instrument  systems.Mechanical Completion,
                        and pre-ccommissioning  activityies .Vendors  activity coordonation,daily staff meeting and  
                        weekly Safety Meeting attended, daily work reports sent to OIM,Project Manager and Project 
                        Director. 

HVAC Commissioning Engineer
Imtech Marine Netherlands/Germany North Sea Wind Farm Platform
dic 2014 - ene 2015
I have been hired for a very short term but very important role by Imtech Marine Holland 
                          (via Progressive Global Energy and Natural Resources Netherlands )especially  for 
                          HVAC Air Balancing all the platform rooms  according to preject request,P&ID,HVAC 
                          Ducting Drawings for each system,technical Details and Specificatins (the winter holidays 
                          period ,especially chosen) .I spent one day i Imtech Marine Netherlands offices on meeting 
                          with managers for project requirements, 
                          project updating and familiarisation,than travel into Wilhelmshaven Germany-Helwin Beta 
                          the client being Heerema Marine Contractors.The  HVAC systems  were successful balanced,       
                          daily work progress report sent  into Imtech Marine Project Manager and Heerema  Client 
                          representatives  as well.
Electrical Commissioning Superintendent
Total E&P Moscow Russia, LNG Kharyaga Phase III upgrading Russia
abr 2014 - jul 2014
Engaged by SNC Lavalin France  for Electrical  Pre-commissioning/Commissioning 
                            Engineering Kharyaga Project Phase III  in Moscow TOTAL’s offices .
                            Technical documentation and specifications reviews,new power generation and substations
                                          SLD’s Mark-Up, electrical sub-system creating, Electrical  OTP’s issuing,and procedures   
                                          P&ID checks/review,FAT/SAT documents and records reviews,
                                          Data Sheet sequipment,checks OPERCOM Database for  Electrical/ equipment  stage,
                                          vendor documents tests,records,compliance with project request and  TOTAl’s standards.
                                          Electrical TQ’s issuing in case of missing documents or non-conformity with project 
                                          Request,standards,HSE and Total specifications.Electrical commissioning dossiers
                                          preparing/populating in ICAPS according  to OPERCOM  Methodology, TOTAL’s Procedures 
                                          and Standards. Daily meeting/discussions/workshops   and  work progress  reports 
                                          sent to Lavalin/TOTAL Commissioning Manager Representative. .Since August 2014 due to  
                                          delicate matters between Russia and Ukraine ,the  project has been officially  postponed for 
                                          1,2 years on Total’s decision.
Electrical/HVAC Commissioning/Start Up Engineer
Shell Kazakhstan , OPF Eskene West/D Island Off-shore Kashagan Field
dic 2012 - dic 2013
Engaged  by Shell/ NCPOC to assure that the Electrical and HVAC equipment  has 
                      been correct installed/commissioned or in course to be commissioned according to Project 
                      request/standards,compliance with Shell standards/specifications and HSE being  ready  
                      for start-up. Review Electrical /HVAC engineering documentation,as built drawings,tests,
                      records,procedures .Preparing the Electrical/HVAC  folders downloading them  from IMIS/ACS 
                      Systems then walkdowns and inspectionsto  into all the OPF areas and Commissioning Units 
                      including substations, instrument and HVAC  rooms.
                      PL items issuing with regards to commissioning units, non-conformity equipments and registered 
                      on ACS System. Walk downs, verifications with OPF Commissioning Teams  for the PL items
                      issued, clarifications and signing-of. Also in charge and responsible for Electrical and HVAC 
                      Commissioning Dossiers review divided by systems and subsystems;verifications for 
                      the missed documents, comments, acceptance/rejections by case then signing-off and ready 
                      for hand over .Involved as Client’s side, as witness/ support/ coordinate commissioning 
                      Electrical/HVAC equipment being un-commissioned yet.
                      Work location  changed on D Island, Off-shore on Shell’s request for helping-out the Start-
                      up & Operate Team;walk downs. signing off  for acceptance or rejections, PL’s  
                      clarification and Commissioning Dossier Reviews for Elctrical/HVAC equipment . Weekly   
                      Safety meetings/Daily Meetings  in the both  locations with Start-Up& Operate Team   
                      Superintendent and Managers.
                      Returned on OPF Eskene West and role changed on Maintenance Department; Involved on 
                       Process Start-up and after a while Shut-down activities; supervising/coordinating day/night  
                      shift  subcontractor Repairs/Maintenance works during process shut-down period, with 
                      regards to the different Electrical/HVAC/Mechanical appeared problems on process units 
                      train 1 and 2. Involved in supervising/coordinating, guidance and technical direction to  
                      subcontractors(ISKER and ICAT commissioning team,generally, Russian teams) for  
                      rebuilding/repairs of heat tracing and cathodic protection system failed on testing. Also,   
                      preservation/winterization activities for Piping,Electrical,HVAC systems.
                      Work progress and reports  daily sent to OPF Eskene West Maintenance Manager
HVAC Coordinator
Saipem Algeria, LNG 3Z Arzew, Oran Algeria Project
nov 2011 - nov 2012
Engaged by Eni-Saipem Algeria  to verify and coordination of running test HVAC/Instrument/
                         Mechanical equipments and Interface Systems already installed or in course to be install  by  
                         Subcontractors, for the buildings and substations according to GNL 3Z project requirements, 
                         Standards,Drawings,Technical Specifications and HSE. Supervising, coordinating the subcontractors 
                         activity,especially installing of HVAC equipment  and modifications,if required.Monitor the 
                        construction activities and provide assistance to the subcontractor to solve out the  problems. 
                        Daily carry-out inspections into HVAC Package Units,Roof Top Units, AHU Units F&G System ,
                         Fire Fighting System, investigations and records with regard to each  device installed, preserved and 
                         corrective actions if requested.Witness and recommendations on  Chillers installing,chilled water  
                         piping flushing/pressure/leak tests and records.HVAC system running tests for each  building 
                         or electrical substation performed by  vendors and sub-contractors to ensure compliance withs
                        standards. Monitoring of HVAC equipment installing for new constructed buildings, workforce 
                        productivity/progress relative to schedule; Interfaces with Sub- contractorQA/QC personnel and 
                        Engineering to address quality issues/progress and ensures compliance with specifications, 
                        procedures, and planning . 
                        Responsible of  pre-commissioning check list  verifications,signing-off the papers,acceptance by case 
                        for all the HVAC building systems.
                        Checks for  completed work packs, raise punch lists if appropriate,punch list acceptance/rejections 
                         by case,QC Non-Conformance and TQ’s issuing for the mentione equipments/systems and also drawings, 
                         procedures updating. Issuing of spare parts equipment for each building/area  and consumables for 
                         HVAC system .
                         Weekly subcontractors man power and works progress recording/updating in  Construction 
                         Management Database and daily works  progress  and recommendations sent to Civil  Buildings Manager.
E/I/T/HVAC Chief Engineer
Tozzi/Agip KCO Kazakhstan, A Island Kashagan Field Off-shore Kazakhstan
ene 2011 - nov 2011
Supervising/coordinating hook-up/modifications project works for A Island local equipment rooms
                        (LER) Electrical System, ESD System, Fire and Gas System, Fire Fighting System, HVAC System, 
                        Telecom System, ICSS interfaces, Installation of equipment, cables, control 
                        and idiscipline nterfaces for the all the mentioned systems Mechanical Completion, Pre-comm 
                        of all the items according to project specifications for each system and Eni/Agip KCO request and  
                        indicatioons.Carried out daily planning of the works and QC inspections for all the installed 
                        equipment Mechanical Completion,pre-commissioning,commissioning,preservation/winterization 
                        and start-up LER Electrical and HVAC System by temporary power load (set generators) 
                        for HVAC Room Low Distribution   Switchboard. 
                        Also responsible for ITR's completing, solving out punch list items according to drawings, 
                        procedures and safety requirement. Responsible for daily leading of  risk assessments and  
                        Toolbox talks in  English, Italian, Russian and Romanian,  and supervise/coordinate all the 
                        works performed by a couple of multicultural teams day and night shift according to Agip Safety
                        Rules and HSE. Attended weekly or daily meetings with A Island  Agip Construction Manager and 
                        Agip’s departments regarding to works plan, work schedule materials and daily works progress. 
                        Daily work reports sent to Agip Hook-up Construction Manager. The last rotation D Island  QA-QC 
                        Mechanical Completions/Pre-commissioning,ITR’s,RFI’s,Punch List  activities for LER’s HVAC 
                        system only.
Electrical Assessor
Petrofac Singapore/CPOC Malaysia , Kota Bahru Muda Field/Platform Off-shore Malaysia
nov 2010 - dic 2010
Engaged on the CPOC (CARIGALI-PTTEP Operating Company) Muda Platform, Malaysia  to 
                         determinate the exact level of  Electrical Technicians and Team Leaders with regard to  
                         Electrical  and HSE knowledge for safe platform operations; gaps found and  clearly training 
                          recommendations for each candidate was recommended and indicated to  Malaysia CPOC 
                          Management and Singapore  Petrofac Training Centre. Personally and professionally 
                          discussions regarding their CV’s,, qualifications, years experience in oil & gas projects. Verbal
                          and written assessments, electrical  questionnaires for each Electrical  Unit and records were 
                          registered for each candidate. At the end of this assessment the candidate personal folder 
                          was issued and sent to Petrofac Singapore and CPOC (CARIGALI-PTTEP Operating Company 
                          Muda Field) accompanied by training recommendations
Electrical/HVAC Maintenance Methods Engineer
Dietsamann /Sonadiets Angola Toulouse France _Pazflor FPSO Maintenance Preparation Team
sep 2010 - nov 2010
Engaged by Dietsmann Engineering Maintenance Toulouse France for Pazflor FPSO  
                        Electrical/HVAC Maintenance dossiers reviewing and training for Electrical/HVAC 
                        Technicians arrrieved from Angola to increase their level of electrical /mechanical instrument
                        knowledge, especially FPSO Power Generation and HVAC System.While 3 days I attemded/
                        completed  Pazflor FPSO Operation Training cours in Total E&P Training Center Lacq France.
HVAC MMO Specialist
BP Angola FPSO Block 17 Greater Plutonio FPSO Off-shore
ago 2009 - ago 2010
Engaged on Greater Plutonio FPSO by BP Angola and  responsible for  whole FPSO
                          Maintenance and modifications HVAC systems in fully production activities. 
                          Supervising/coordinating/performing FPSO preventive, corrective and breakdown
                          maintenance activity according to maintenance procedures, maintenance manufacturer 
                          manuals, procedures technical specifications and HSE. Supervising/coordinating vendor 
                          activity regarding to Pressure Balancing tests and corrections for Accommodation all the  
                          levels AFT/FWD Machinery Spaces ,LER’S/Modules etc… Updating  FPSO HVAC System
                          Accommodation Procedures; preparing  all the requests regarding to spare parts, tools
                          and consumables. Training activities in French or English for the HVAC local technicians
                                        Participated in the S.T.O.P and B.O.S.S  Safety program and in the weekly Safety
                                        Meetings.Daily meeting with Maintenance Superintendent, daily reports regarding to HVAC  
                                        maintenance activity HVAC Maintenance  Planning by Work Orders, preventive, corrective and 
                                        breakdown maintenance solving and solutions.
Power Generation Electrical Trainer
Dietsmann/Eni Agip Corporate University Aksai Kazakhstan KPO Karachaganak Aksai Kazakhstan
ago 2008 - jul 2009
On classroom and  on job training activities in Aksai Training Centre regarding to 
                          KPO Aksai Power Plant and Power Generation for Electrical Technicians and Junior Electrical 
                          Engineers using English and Russian Languages.  Responsible for implementing a training plan. 
                          Theoretical lessons/Electrical/Instrument  Course, Presentations regarding Electrical  Physics,  
                          High/Low Voltage Electrical Equipments, Generators, Gas/Steam Turbines, Step-up/Down 
                          transformers,Drawings, Installing of Electrical Equipment, Preservation, Testing/Commissioning,
                          Start-up,Protections on High/Low Voltage Equipment and Interfaces Monitor/Control of Electrical 
                          Instrument Equipments, HSE, Rules on Power Plant, Safety Electrical Rules, Safety Procedures  
                          High and Low Voltage, ROK Electrical Safety Rules-Procedures…etc.
                          Daily Test Questionnaires given to the students, Weekly Reports regarding to our daily activity, 
                          Evidence Competence Matrix, Individual Evolution Form for  each student sent to ECU Milano  
                          Italy and Agip KCO Atyrau Kazakhstan. Individual theoretical/practical final assessments by 
                          Eni/Agip KCO Assessors Team having excellent results
Electrical Commissioning Engineer
Shell Russia/Sakhalin Energy OPF Lunskoye Sakhalin Island Russia
sep 2007 - ago 2008
Electrical commissioning and start-up activities for  process, utilities and infrastructure 
                         systems associated with the Gas Processing Plant.  Commissioning systems/subsystems in 
                         accordance with the Shell commissioning procedures and commissioning start-up schedule. 
                         Coordination/supervision and guidance to subcontractors related to Electrical 
                         commissioning activities divided by systems-sub systems. Involved in Vendor supervising/
                         coordonating activity for Booster Pump Motors, Synchronous Motors-Lube Oil system,DC/AC  
                         Circuits,Variable Frequency Starting/Speed Control,Excitation Systems,Auxiliary Circuits….etc.   
                         On Shell’s request position changed – Preservation  Commissioning Engineer- 
                         Responsible for the execution, testing of constructed/commissioned Electrical/HVAC equipment, 
                         systems and materials meet defined preservation standards. Supervising-coordinating preservation
                         Russian teams activities issuing ISSOW Work Permits and SAP Maintenance  Work Order  Forms for
                         preservation/winterization activities during commissioning activities till hands on to operations.
                          Daily,  control and monitor for all the installed equipment for winterization and maintenance and
                          corrective action by case. Providing Electrical/HVAC Preservation Certificates and supporting  
                          documents for all the  subsystems to Completions File. Daily meetings and Reports sent to 
                          Commissioning Manager regarding the Electrical/HVAC System Progress  and  Electrical /HVAC  
                          Preservation/Winterization activities.
Electrical Engineer
Amec Spie/Total Angola Gas Pipeline/New Life Camp
abr 2007 - sep 2007
Responsible for all Electrical/Air Conditioning works –Design/Installing/Preservation/
                          QA-QC,Commissioning/Start-up to a new Life Camp and Cathodic Protection Pipeline  works 
                          located in Soyo town (onshore) Angola.  Coordination, technical direction and support to  
                          subcontractors with regards to pipeline cathodic protection electrical equipment installing/
                          commissioning according TOTAl’s GS’s and Procedures,Standards,HSE,Technical Details and 
                          Instructions. Personal design of electrical systems, cable sizes, routes, electrical control 
                          panels, coordinating and supervising electrical  works for new camp life Offices and Utilities 
                          (including set generators and substation, installing electrical equipment protection lighting 
                          and lightning systems)ensuring that the works comply with TOTAL requirements, GS’s, 
                          Procedures, project  specifications, standards and HSE.
                          Daily work progress sent to Construction Manager and weekly management meetings with 
                          Total E&P Angola
Electrical Engineer/Manager
Takenaka Europe GmbH Calsonic Kansei New Factory Ploiesti Romania
abr 2006 - mar 2007
Responsible to review and approve electrical/instrument P&ID and  drawings, installing of electrical 
                          Instrument equipment preservation, testing and commissioning of electrical equipment  
                          including power station to ensure that the  subcontractor's works complies with the project 
                          specifications,standards,updated contract drawings,technical details  and terms of execution.
                          Providing engineering design guidance and   designed   drawings verification including: Single Line
                          Diagrams, Transformer Station Drawing 20Kv/0,4Kv, Power,Instrument and Control Layout 
                          Drawings, Cablle Trays & Conduit Layout Drawings, Lighting &Grounding Layout Drawings, Cable & 
                          Conduit Schedules, Control Schematics & Wiring Diagrams and Electrical /Instrument    
                          Specifications.Carry out works in accordance with project and client engineering HSE,QA-QS and 
                          report  progress and problem areas related to the execution of the work. Daily meetings with 
                          Japanese Staff and weekly HSE meetings.
HVAC Maintenance Specialist
Sabratha Gas Platform off-shore Libya
sep 2005 - abr 2006
Engaged and responsible for HVAC maintenance   preventive/corrective and breakdown 
                          maintenance activities.Supervising/coordinating maintenance activity and solve-out  all the 
                          appeared troubleshooting; daily work permits depending of priorities; daily reports  regarding
                          system problems and solutions to platform  Maintenance Superintendent .Training activities 
                          for Libyan  Nationals with regard to HVAC  systems, system Interfaces, Work orders, 
                          Procedures, HSE and work safe practices, Electrical/HVAC Safety Rules…..etc
Electrical/HVAC Manager
SOGEC Gabon Afica Site Gabon President Palace
abr 2005 - sep 2005
Engagd and responsible for all project coordonation Construction, QA QC, Commissioning &
                         Start Up Electrical / HVAC system,Diesel Genarators, Air Condition System, TV System,       
                         Telephone–Lan system, system interfaces,external-internal  lighting system.lightning sustem
                         6Kv/0,4 Kv substation for Gabon President Palace in Oiem town at over 600 Km from 
                         central office SOGEC Libreville.
                         Daily meeting with team leaders with regrads to planning/work progress,appeared  
                         problems,modifications.solutions,drawings updating .Daily supervision/coordonation  all the
                         works  to assure that the project comply Project Design,Project Standards,Equipment,
                         Project Specifications,Planning ,Procedures,HSE and Work Safe Practices..
                         Review the project budget accorded,project steps execution,work schedule, manpower,
                         and prorities,daily/weekly work planning, tools,materials, cars fuel and maintenance costs  
                         material suppliers and prices  invoicies,receipts; in addition in charge with work 
                         contracts  and   weekly salaries for locals personel,providing in advance accommodation
                         (rented houses,meals,transportation  in-out site/town )for   SOGEC personnel arrived  
                         from  main office  Libreville;permanently and full  time focused/connected  on project.
                         Daily/weekly work reports sent to SOGEC Libreville Project Director .
Electrical/HVAC Engineer
Bouygues Turkmenistan _Turkmenistan Maintenance President Palace
oct 2003 - abr 2005
Chosen and involved in a very delicate and important position, where the activity of the 
                         maintenance team and the demands of the Turkmenistan president regarding utilities were 
                         controled and monitored either day or night from hour to hour by the security team of the 
                         presidential palace.
                         Day  to day maintenance activity for the technical building and utilities of the Turkmenistan 
                         presidential palace (Archabil_Firuza), composed of HVAC Chillers Plant and 15 AHU, Power 
                         Plant 6Kv / 0.4 Kv,Water Producing and Treated Plant, Sewage Plant, Waste Plant and System 
                         interfaces, all the above computerised  systems,in accordance to Procedures, Maintenance 
                         Manuals Technical/Safety Specifications and Standards .
                         Responsible for entire palace maintenance daily works for the above plants and systems, 
                         monitoring plant parameters  taking the  right steps/decisions for corrective actions, if 
                         necessary; daily work permits issuing, identifying of any risks which may effect the work
                         schedule or maintenance activities; daily report reports to Maintenance  Coordinator.
                         Responsible for all  field operations in power station(high,medium,low voltage) water   
                         production and treatment, HVAC  Rooms, Risk Assessment, Hazards and Controls. Work 
                         location changed and involved in Electrical/HVAC  Commissioning activities for Commercial 
                         Bank, Exhibition Palace Ashgabat City ,buildings with  over ten floors.
Chief Site
Oztasar UK New Factory Ploiesti City Romania
ago 2000 - sep 2003
Responsible for all site Hook-up/Construction ,QA-QC,Commissioning, Start-up
                         Electrical/Diesel Generators/HVAC/AC works and  system interfaces to the new ready-made 
                         clothes manufacturer (4 phases) production halls, offices and utilities in accordance with the 
                         Project Design,Standards,Procedures,Technical Instructions, and HSE.Daily/weekly meetings,
                         regarding work progress,Daily Reports sent to Project Director and Client/Owner as well.
Electrical Coordinator
DIS Interplast Italy _New Factory Filipesti Targ, Prahova County, Romania
jul 1999 - ago 2000
: Engaged and responsible for supervision/coordonation Construction, QA-QC, 
                         Pre-commissioning, Commissioning and Start-up Electrical/HVAC,Diesel Genarator systems,
                         Boiler/Steam Plant/stean piping network, and system interfaces for new plant plastic hangers 
                         and devices,production halls,offices and building utilities according to the Project Design,
                         Standards,Procedurres,Technical Instructions, and HSE. .Daily/weekly meetings,
                         regarding work progress,Daily Reports sent to Project Manager and Client/Owner as well
Lead Electrical Shift
Luk-Oil Refinery Ploiesti City Romania_Power Plant Maintenance and Repairs
oct 1978 - jun 1999
Supervising/coordinating and responsible  for all the   maintenance works and  H/L voltage 
                          equipment repair activities in power stations 400Kv/110Kv and 6Kv/0,4Kv.Servicing, 
                          repairing , intervention and maneuvers 6kv/0.4kv  permanent  electricity provided   for  
                          production plants.Shutdowns power plant periodically for planned maintenance activities.
                          Work place   changed  in the    Main Power Plant 400kv/110kv;  more  than 10 years serviced 
                          in LNG/Gas Plant/Sulphur Plant and  over 20 years involved  in  the majority power  plants 
                          from Luk-Oil Refinery including the main work shop engines/motors repairs and  H/L voltage 
                          Power Stations electrical equipment repairs.
Site Electrical Technician
TIAB/OMW Refinery Ploiesti City Romania, Electrical Power Station Site
Installing/testing  of all the electrical and instrument equipment for a new Gas 
                                          Plant Power Station; mounting  of H/L voltage cells,step-up/down transformers
                                          bus bars and duct bars, grounding, lighting and lightning system, UPS,bank batteries
                                          and connections,instrument and control cables, panels,protection system, fixtures,
                                          cable terminations, cable connections,machinery equipment,emergency diesel
                                          generators and accesories......etc ,according to Drawings,P&ID,Technical Specifications,
                                          Data Sheet Equipment,Vendor Manuals,Procedures,HSE  and safe work practices.