Electrical engineer

Cos*** ***** (XX años)
SENIOR ELECTRICAL ENGINEER en Tecnicas Reunidas Madrid
Madrid,
Madrid
Este candidato esta dispuesto a trasladarse
|
Experiencia
SENIOR ELECTRICAL ENGINEER
Tecnicas Reunidas Madrid
nov 2009 - jul 2020
COSTICA AVRAM

Senior Electrical EPC Engineer


Honours graduate in Electrical Engineering with over 30 years of commercial work experience as an Electrical Engineer. Substantial experience of working in foreign countries, in international, multicultural, multidisciplinary environments. Fluent command of English, with an independent working style: I work well on own initiative and I can recommend FEED decisions without feeling the need constantly refer to Head Office.

Professional Summary

Electrical Engineer with over 30 years of experience in the field of Petrochemical, Oil and Gas Wood and Buildings, performed:

•	Electrical engineering design including sizing and selection, procurement and construction work ;
•	Support consistent implementation of the company division’s HSEQ, Engineering Standards and Guidelines and best engineering practices and disseminates learning captured from projects throughout the company’s division facilities engineering community;
•	Act as the company division’s Technical Authority in electrical related matters, review and respond to requests for deviation’s standards;
•	Respond to ad-hoc requests for technical advice from Branch Offices;
•	Act as Team Leader on specific electrical/power projects;
•	Keep track on technology development, maintain contact with equipment and services suppliers;
•	Provide mentoring and coaching of junior engineers and trainees;
•	Reviewing and comments documents issued by the vendors;
•	Review vendor drawings and implement the P&ID requirements into electrical design ;
•	Implement the P&ID requirements into electrical design.
•	Supervision of installation, start-ups and commissioning of global electrical systems (power system, lighting and lighting roods) for several projects;
•	Co-ordinating electrical side for several projects with consultants and contractors;
•	Preparing tender documents and technical bids evaluation;
•	Maintenance of electrical systems and excellent problem solving skills;
•	Solid experience in the electrical systems [HV/MV/LV Main Switchboards; Main Substation (MS), Switchgear Substation (SWGR)(SWR) MCC, low tension stations and sub-stations, medium tension stations and medium tension substations, wiring diagrams, landscape cable route; dimensioning power cable and control cable; cable support systems; etc);
•	Computer literacy (AUTOCAD 2013 – 2D format, MICROSTATION; auto - SACS 4.0; MS Office (Word, Excel), MERIDIAN; Windows, ETAP; SAP);
•	Attended many training courses and seminars, related to field electrical equipment’s, power systems, organised by leading European companies (Schneider; ABB, Moeller; Siemens etc;
•	Ability to work independently as well as working within a team environment
•	Team leading experience and good experience in dealing with people from different cultural backgrounds (architects, mechanical engineer, chemical engineer, etc) 
•	Strong communications and interpersonal skills
•	Willing to travel and flexible to work on different site throughout the world

Professional Qualifications
BSc Electrical Engineering – 1989

Studies and specialisations	
•	University “Gheorghe Asachi” of Iasi (formerly known as Institutul Politehnic Iasi)-ELECTRICAL ENGINEERING, (5 years)
•	License for designer on areas which danger of fire-explosion offer by Romanian Authorities (European code)(EEx)(INSEMEx Petrosani Romania)
•	License for make project offer by Romanian National Authorities 
•	Designer in AUTOCAD 2013  –2D by layers 
•	MicroStation
•	Auto-SACS version 4.0
•	ETAP
•	NEC
•	ADCO
•	SAUDI ARAMCO STANDARDS
•	SHELL DEP
•	ABS Rules

Year of Birth	
1964

Education

MV/LV Power Systems
Electrical, industrial, low, medium installations
AC asynchronous motors protections, and control
Triphase medium/low tensions transformer
Medium and low stations and sub-stations (MV/LV Main Switchboard, Main/Switchgear/MCC)
Low power and lighting panels
Landscape cable route arrangements;
Internship connections:
•	MCC with PLC (ESD/DCS) (according with P&I diagrams);
•	MV Main Switchboard’s with Power Management System, Generators, UPS’s, Neutral Point Resistor, Drives, Transformers, Soft Starters,  AVR and Generator Governor, FiFi Cabinets,
Neutral Point Resistor Calculation;
Coordination Protection Study;
System Transient Stability;
Ground Systems (IT; TT; TN-C; TN-S);
Landscape lighting system;

Address:			
For Romania:    Street. DOBROGEANU GHEREA; ONESTI; BACAU; 601040; ROMANIA

Telephone
+40-722-950115

e-mail
ingstarsrl@yahoo.com

Memberships
Member of the SIEAR (Romanian Society of Electrical & Control Engineering) since 2000

Nationality
Romanian

Languages
Technical English very good
Technical Spanish very good





Employment History
2019 (July) to Present    Senior Electrical Engineer – GRUPO TECNICAS REUNIDAS - (location: MADRID - SPAIN). 
ADNOC (DAS-ISLAND: IGD EXPANSION PHASE II (IGDE2)) PROJECT.

2018 (May) to 2019 (July)    Senior Electrical Engineer – GRUPO TECNICAS REUNIDAS -   INITEC  PLANTAS INDUSTRIALES (location: MADRID - SPAIN). 
NOVA CHEMICALS-AST2 PROJECT (DEVELOPMENT OF A NEW GRASS ROOTS POLYETHYLENE UNIT-SARNIA (CORUUNA), ONTARIO, CANADA).

2015 (September) to 2018 (May)   Senior Electrical Engineer – GRUPO TECNICAS REUNIDAS -   INITEC  PLANTAS INDUSTRIALES (location: MADRID - SPAIN).
EPC&C OF GAS TRAIN 5 PROJECT AT MAA REFINERY- KUWAIT.
•	Project Specifications.
•	MV/LV Switchgears & MCC Single Line Diagrams.
•	Bulk materials: data sheet & requisitions.
•	Annunciator Panels: wiring diagrams & requisitions.
•	Cable trays and conduits: Requisitions.
•	Earthing materials: Requisitions.
•	Implement the P&ID requirements into electrical design.
•	Review vendor drawings and implement the P&ID requirements into electrical design.
•	Equipment Sizing and Selection.
•	Schematic and Interconnection Diagrams for LV & MV motor starters and feeders.
•	HAZOP.
•	Preparing tender documents and technical bids evaluation. 
•	Reviewing and comments documents issued by the vendors (P&ID’s, Nitrogen compressors skids, Air Compressors skids , Distribution Panels, SLD, LV Motors & HV Motors, Package PLC, Package MCC, Buildings HVAC Electrical Distribution, Buildings HVAC MCC, Aircrafts panels and lighting distribution, etc).
•	Act as the company division’s Technical Authority in electrical related matters, review and respond to requests for deviation’s standards;
•	Liaison with other engineering disciplines to ensure no conflicts existed between electrical equipment installation and other equipment’s;



 2014 (March) to 2015 (September)     Senior Electrical Engineer – GRUPO TECNICAS REUNIDAS -   INITEC PLANTAS INDUSTRIALES (location: MADRID - SPAIN).
Project: EPCC PROCESSING & PRODUCTION FACILITIES, ADRAR. TOUATGAZ PROJECT IN ALGERIA                                                                                                                                                                 
•	Design and engineering for electrical installations (electrical distribution, lighting, earthing and power outlets) required in the seventeen buildings.
•	Indoor & Outdoor Lighting and Distribution Boards Single Line Diagrams, Data Sheets, Requisitions, etc.
•	Project Specifications.
•	Project materials take off.
•	Project bulk materials: data sheet requisitions.
•	Equipment Sizing and Selection.
•	Buildings and Areas Lighting Calculation (DIALUX Software).
•	Reviewing and comments documents issued by the vendors (P&ID’s, Skids , Distribution Panels, SLD, LV Motors, Package PLC, Package MCC, Buildings HVAC Electrical Distribution, Buildings HVAC MCC, etc).
•	Schematic and Interconnection Diagrams,
•	Liaison with other engineering disciplines to ensure no conflicts existed between electrical equipment installation and other equipment’s;

2012 (May) to 2013 (December)     Senior Electrical Engineer – GRUPO TECNICAS REUNIDAS -   INITEC PLANTAS INDUSTRIALES (location: MADRID - SPAIN)
Project: Canadian Natural Resources Limited (CNRL) HORIZON Oil Sands VRU-DRU & HSU PROJECT (EPC Project).

•	Reviewing and comments documents issued by the vendors (P&ID’s, Vendor Panels GA, SLD, HV/MV/LV Motors, Transformers, Heaters, etc)
•	MV/LV MCC Single Line Diagrams, Data Sheets, Requisitions, etc,
•	Schematic and Interconnection Diagrams,
•	Device Net & Profibus I/O list,
•	P&ID’s Comments,
•	Reviewing and comments documents issued by the vendors (MV/LV MCC’s, P&ID’s, Vendor Panels GA, SLD, HV/MV/LV Motors, Process Heater Panels, etc)
•	Indoor & Outdoor Lighting and Distribution Boards Single Line Diagrams, Data Sheets, Requisitions, etc
•	MV/LV Cable schedule
•	Performing Calculations;
•	Equipment sizing and Selection:
•	Areas Lighting Calculation (DIALUX Software);
•	Preparation of complete detailed design drawings as required for project construction;
•	Liaison with Tecnicas Reunidas engineering disciplines to ensure no conflicts existed between electrical equipment installation and other equipment;


2009 to 2012 (May)   Senior Electrical Engineer – GRUPO TECNICAS REUNIDAS -   INITEC  
                               PLANTAS INDUSTRIALES (location: MADRID - SPAIN)

Project: “EPC FOR SAHIL & SHAH FULL FIELDS DEVELOPMENT PROJECT” for ADCO (Abu Dhabi Company for Onshore Oil Operations). Detailed design of facilities for ADCO at Sahil and Shah Plants Abu Dhabi.

•	Reviewing and comments documents issued by the vendors (P&ID’s, Vendor Panels GA, SLD, HV/MV/LV Motors, Transformers, Heaters, etc)
•	Performing Calculations;
•	Equipment sizing and Selection:
•	Areas Lighting Calculation (DIALUX Software);
•	Preparation of complete detailed design drawings as required for project construction;
•	Liaison with Tecnicas Reunidas engineering disciplines to ensure no conflicts existed between electrical equipment installation and other equipment;


2008 to 2009 (august)   Lead Electrical Engineer – MV Power System “KEPPEL NORWAY AS” -   
                              Automation & Drives Department (location: STAVANGER - NORWAY)

Keppel Norway (KNo) is a multi-discipline organisation directed toward offshore and maritime based industries. The organization is projects oriented and based on competent personnel, flexibility, and have a close relationship with the sub-suppliers.
•	Responsibilities: 
Design Principles Review; Design Verification; Design Validation; Technical Drawings & Documents; Technical Queries; Inspection; Work Order Instructions; Interface with client; Interface with 3rd party; Correspondence to Company; Correspondence to Authorities; Correspondence to Sub-Suppliers; Discipline Work Preparation; Wight Control Report; Sub-Contractors Control; Site Work Instructions; Material Requisitions;
Project: Drilling Semi-Submersible for 9000 feet water depth: 11 kV Power System (10 generators (3560 kVA)). The system has 2 switchboards -each divided by bus tie breaker- operated in ring network.
•	11 kV Main Switchboard:
o	Single Line Diagrams;
o	General Arrangements;
o	CT’s Calculations;
o	Circuit Diagrams (for each cubicle) (total 38 cubicles);
o	FDS (Functional Design Specification);
o	Coordination Protection Study;
o	FAT Procedure;
o	Interconnections diagrams (with PMS/VMS (by Kongsberg), AVR+Governor Panels, Neutral Point Resistor (NPR) Panels, UPS’s, Thrusters Transformers, Drilling Transformers, Ship Service Transformers, Thrusters AC Drives, Drilling AC Drives, LV Main Switchboards, 
o	AVR + Governor Panels Circuit Diagrams;
o	AVR + Governor Panels General Arrangements;
o	Neutral Point Resistor Calculation;
o	NPR Panels Circuit Diagrams;
o	NPR Panels General Arrangements;
o	UPS’s General Arrangements;
o	UPS’s Circuit Diagrams;
•	Commissioning Procedures for 11 kV Power Equipments (with commissioning check list for each type of equipment);
•	Participate to 11 kV Main Switchboards FAT;
 Project: Accommodation Semi-Submersible Unit: 6.6 kV Power System (4 generators (3560 kVA)). The system has 2 switchboards, each divided by bus tie breaker.
•	6.6 kV Main Switchboard:
o	Single Line Diagrams;
o	General Arrangements;
o	CT’s Calculations;
o	Circuit Diagrams (for each cubicle) (total 18 cubicles);
o	FDS (Functional Design Specification);
o	Interconnections diagrams (with PMS/VMS, AVR+Governor Panels, Neutral Point Resistor (NPR) Panels, UPS’s, Thrusters Transformers, Ship Service Transformers, Thrusters AC Drives, FIFI Pump Soft Starters, FiFi Control Cabinets, LV Main Switchboards, 
o	AVR + Governor Panels Circuit Diagrams;
o	AVR + Governor Panels General Arrangements;
o	Neutral Point Resistor Calculation;
o	NPR Panels Circuit Diagrams;
o	NPR Panels General Arrangements;
o	UPS’s General Arrangements;
o	UPS’s Circuit Diagrams;
o	FiFi Pump Soft Starters General Arrangements;
o	FiFi Pump Soft Starter Circuit Diagrams;

2007 to 2007      Electrical/Instrumental Engineer –  AKER SOLUTIONS -  AKER 
                           KVAERNER PROCESS SYSTEMS - NORWAY (location: OSLO)

Aker Kvaerner Process Systems is a supplier of selected process equipment for the treatment of oil, gas, produced water and solids for the upstream oil and gas. I was an active participant in the execution phase of our oil and gas process equipment projects and packages. Reports to the Project Manager:                                                                                                                                                     - Planning and execution of mainly instrumentation and to some extent, electro discipline activities in our projects;                                                                                                                                                      - Technical Specification of Equipment;                                                                                                   - Technical evaluation and selection for purchase of instruments and equipment;                                  - Active participation in development of concepts and project execution;                                                - Discipline responsibility and technical advisory to our bid team;                                                                 - Personal initiative and focus on quality and HSE;                                                                                       - Cable layout (cable sizing, cable trays,…. etc);                                                                                      - Light Calculation and design;                                                                                                                 - Heat tracing;                                                                                                                                           - Distribution systems (Panels, JB, AC VFD; AC VSD… etc);                                                                  - Documentation of skids electrical installation;                                                                                              - Testing and follow-up at site; 

2006 to 2007           Senior Electrical Designer Engineer –  GRUPO TECNICA REUNIDAS -  INITEC Plantas Industriales - SPAIN (location: Madrid)

Performing in-house electrical design work, preparing complete design documents.
[Project: “HAWIAH GAS PLANT EXPANSION” for SAUDI ARABIAN COMPANY (2 new Gas Treating Facility; 1 new Dehydratation and Dew Point Control; 2 new Sales Gas Compressor; 1 new Sulphur Recovery;1 new Inlet Area)]

•	FIELD: Power layout (cable trays/conduits layout; cable trays layout) grounding layout; lighting plan/layout/detail/calculation/bloc diagrams);
•	Typical (elementary ) diagrams for motors, transformers, lines, lighting & power panels;
•	Inter-connection with instrumentation discipline according with P&I diagrams;
•	MV/LV substations: (13,5 kV switchgear; 4,16 kV switchgears; 480 V switchgears; 480 V MCC’s)(electrical and grounding plan/layout/one line diagrams/ overall diagrams/detail);
•	Cable & conduit schedules;
•	Cables size dimensioning;
•	Data sheets;
•	Bid comparation
•	Area classification;
•	Blackout lighting;

2003 to 2006	Lead Electrical Designer Engineer – RAFO Oil Company Romania

              Supervised teams of 5 engineers, technicians and drafters

  Performing: in-house electrical design work, preparing complete design 
documents, reviewing design documents, supervising the new installation and commissioning.
Contributed to the following projects: Additivation diesel oil; Oil Movement and 
Cargo Pumps, Oil & Gas Platforms; Review and development, Oil and water stations of pumps . 

1996 – 2003	Lead Electrical Designer Engineer – CHIMCOMPLEX Petrochemical Company Romania

              Supervised teams of 2-9 engineers and technicians 

	Performed: electrical design work (wiring diagrams for stations sub-stations and panels; power and control cables route; ac motor protections and controls; MCC; electrical diagrams review and development, running sizing programmes, installation details, MCC schematics; adapted same projects to Rumanian orders) for the following projects:	
	Installation for product Oxiclorura of cuprum; Installations for product monoxide of carbon; Installation for product hypochlorite  sodium; Installation for platforms to Oil terminal Constanta and Galati; installations for product detergents by Chemiton Seattle and Schugi Hosokawa Belgium (adapt to Rumanian order);Installations for product chloride calcium; Wood panel Company  Comanesti for Finn Forest Holding Finland 
	

1994 – 1996	Electrical Designer Engineer – CHIMCOMPLEX Petrochemical Company Romania

	Performed: Design, pump motor protections, cool motor protections; compressor motor protections; low tension power and lighting  panels wiring diagrams, landscape power and control cables, medium/low transformation stations; lighting landscape installations calibration, configuration panels, arrange equipments in panels.


1989 – 1994	Maintenance Electrical Engineer.  CHIMCOMPLEX Petrochemical Company Romania 	
Maintenance, diverse type of electrical installations for low and medium tension.